APLICACIÓN

The Hyundai Waste Energy Recovery Co-Generation Project Phase II

VCS-1146

Korea, Republic of

Eficiencia energética

ACM0012

Descripción

Hyundai Waste Energy Recovery Co-generation Project Phase II The Hyundai Waste Energy Recovery Co-generation Project Phase II is a 400MW cogeneration plant located at Dangjin Hyundai Steel Mill. This project, developed by Hyundai Green Power CO., Ltd., utilizes surplus waste gases including BFG (Blast Furnace Gas), COG (Coke Oven Gas), and LDG (Converter Gas) generated by Dangjin Hyundai Steel Mill to generate electricity. By recycling the waste gases, the steel mill is able to reduce emissions and minimize waste. Key Highlights: - The project generates approximately 2,306,076MWh of electricity, which is sent to the power grid. - Steam is produced and sent to Hyundai Steel Mill, reducing their need for additional energy sources. - Without this project, the waste gases would be emitted to the atmosphere after incineration. This project is important because it reduces emissions and waste while generating valuable energy. By utilizing otherwise wasted resources, the Hyundai Waste Energy Recovery Co-generation Project Phase II is a sustainable solution for energy production.

Listado de vendedores

$1.02

Toneladas disponibles

298,147

Vintage

2015

Registro

Logotipo del registro

Verified Carbon Standard

Ver verificación detallada del proyecto

Verificado y Certificado

Cada crédito representa una tonelada de emisiones de CO2 reducidas, eliminadas o evitadas, según lo verificado por auditores de terceros aprobados por el registro.

Objetivos de Desarrollo Sostenible

Tomar medidas urgentes para combatir el cambio climático y sus impactos.
Obtenga más información sobre los ODS de la ONU.

Estadísticas

Datos para este proyecto

Total de retiros

1836,26

Suministro Total Restante:

298.147,82