アプリ

The Hyundai Waste Energy Recovery Co-Generation Project Phase II

VCS-1146

Korea, Republic of

エネルギー効率

ACM0012

説明

Hyundai Waste Energy Recovery Co-generation Project Phase II The Hyundai Waste Energy Recovery Co-generation Project Phase II is a 400MW cogeneration plant located at Dangjin Hyundai Steel Mill. This project, developed by Hyundai Green Power CO., Ltd., utilizes surplus waste gases including BFG (Blast Furnace Gas), COG (Coke Oven Gas), and LDG (Converter Gas) generated by Dangjin Hyundai Steel Mill to generate electricity. By recycling the waste gases, the steel mill is able to reduce emissions and minimize waste. Key Highlights: - The project generates approximately 2,306,076MWh of electricity, which is sent to the power grid. - Steam is produced and sent to Hyundai Steel Mill, reducing their need for additional energy sources. - Without this project, the waste gases would be emitted to the atmosphere after incineration. This project is important because it reduces emissions and waste while generating valuable energy. By utilizing otherwise wasted resources, the Hyundai Waste Energy Recovery Co-generation Project Phase II is a sustainable solution for energy production.

販売者のリスト

$1.02

利用可能なトン数

298,144

ヴィンテージ

2015

登録所

登録所のロゴ

Verified Carbon Standard

詳細なプロジェクト検証を表示

検証済み & 認証済み

各クレジットは、レジストリ承認の第三者監査人によって検証された、削減、除去、または回避された1トンのCO2排出量を表します。

持続可能な開発目標

気候変動とその影響に対処するために緊急の行動を取る。
UNのSDGsについて詳しく学ぶ

統計

このプロジェクトのデータ

総退職者数:

1,839.26

残りの総供給量:

298,144.82