アプリ

The Hyundai Waste Energy Recovery Co-Generation Project Phase II

VCS-1146

Korea, Republic of

゚ネルギヌ効率

ACM0012

説明

Hyundai Waste Energy Recovery Co-generation Project Phase II The Hyundai Waste Energy Recovery Co-generation Project Phase II is a 400MW cogeneration plant located at Dangjin Hyundai Steel Mill. This project, developed by Hyundai Green Power CO., Ltd., utilizes surplus waste gases including BFG (Blast Furnace Gas), COG (Coke Oven Gas), and LDG (Converter Gas) generated by Dangjin Hyundai Steel Mill to generate electricity. By recycling the waste gases, the steel mill is able to reduce emissions and minimize waste. Key Highlights: - The project generates approximately 2,306,076MWh of electricity, which is sent to the power grid. - Steam is produced and sent to Hyundai Steel Mill, reducing their need for additional energy sources. - Without this project, the waste gases would be emitted to the atmosphere after incineration. This project is important because it reduces emissions and waste while generating valuable energy. By utilizing otherwise wasted resources, the Hyundai Waste Energy Recovery Co-generation Project Phase II is a sustainable solution for energy production.

販売者のリスト

$1.02

利甚可胜なトン数

298,144

ノィンテヌゞ

2015

登録所

登録所のロゎ

Verified Carbon Standard

詳现なプロゞェクト怜蚌を衚瀺

怜蚌枈み & 認蚌枈み

各クレゞットは、レゞストリ承認の第䞉者監査人によっお怜蚌された、削枛、陀去、たたは回避された1トンのCO2排出量を衚したす。

持続可胜な開発目暙

気候倉動ずその圱響に察凊するために緊急の行動を取る。
UNのSDGsに぀いお詳しく孊ぶ

統蚈

このプロゞェクトのデヌタ

総退職者数

1,839.26

残りの総䟛絊量

298,144.82