ПРИЛОЖЕНИЕ

Teesta- V Hydro Power Project In Sikkim

VCS-766

India

Возобновляемая энергия

ACM0002

Описание

NHPC's Teesta HE Project - Stage V: A Sustainable Solution for Energy Production NHPC, a Government of India enterprise, is implementing the Teesta HE Project - Stage V, a run-of-the-river scheme aimed at producing sustainable energy for the Eastern region of India. This project has installed a capacity of 510 MW, composed of three 170 MW turbines that will generate a total of 2572.67 MU of energy, which will be absorbed into the NEWNE grid. Key Highlights: - The project is located near Singtam, about 4 km upstream of the confluence of Rongnichu with Teesta. - The Teesta river project features a concrete gravity dam across the river with a 15 km long head race tunnel and an underground power housing three generating units of 170 MW capacity each. - The dependable discharge available throughout the year has been assessed as 60 cumecs and gross head available is 216.73 m. - The energy generation at 90% dependable year and 95% machine availability is 2572.67 million kWh. The Teesta HE Project - Stage V is a significant renewable energy project that provides a sustainable solution for energy production. The project's dependable discharge, gross head available, and installed capacity of 510 MW ensure a consistent and reliable source of energy throughout the year. Additionally, the energy generated from this project will contribute to India's goal of reducing carbon emissions and moving towards a more sustainable future.

Объявлений не найдено.

Реестр

Логотип реестра

Verified Carbon Standard

Просмотреть подробную проверку проекта

Проверено и сертифицировано

Каждый кредит представляет собой одну тонну выбросов CO2, которые были сокращены, удалены или предотвращены, как это подтверждено аудиторами третьей стороны, одобренными реестром.

Статистика

Данные для этого проекта

Итого выведено

200,03

Общее оставшееся количество:

677 668,99