แอป

Alkumru Hydroelectric Power Plant

VCS-1464

Türkiye

พลังงานทดแทน

ACM0002

คำอธิบาย

The Alkumru Hydroelectric Power Plant, also known as Alkumru HPP, is a hydroelectric power project located in the Eastern Anatolia Geographical district of Turkey. The project is situated on the Botan River, which is a major tributary of the Tigris. The Alkumru HPP harnesses the power of the Botan River to generate electricity. Key Highlights: - The Alkumru HPP uses the head difference between the 647 m maximum water level and 541.80 m tail water levels to generate energy. - With the latest design updates, the project is expected to produce an annual amount of 881,210 MWh of electricity. - The project generates 475,143 tonnes of Verified Carbon Units (VCUs) per year, which helps to reduce greenhouse gas emissions. The Alkumru HPP project is important because it provides a renewable source of energy that helps to reduce greenhouse gas emissions. By harnessing the power of the Botan River, the project is able to generate a significant amount of electricity without relying on fossil fuels. This not only helps to reduce carbon emissions but also provides a sustainable source of energy for the people of Turkey. Additionally, the project helps to support the local economy by creating jobs and providing a source of income for the surrounding communities.

รายการขายของผู้ขาย

$0.84

มีตันที่มีจำหน่าย

42,133

เก่าแก่

2018

ทะเบียน

โลโก้ทะเบียน

Verified Carbon Standard

ดูการตรวจสอบโครงการอย่างละเอียด

ได้รับการตรวจสอบและรับรอง

เครดิตแต่ละหน่วยแทนการลด การกำจัด หรือการหลีกเลี่ยงการปล่อย CO2 หนึ่งตัน ซึ่งได้รับการตรวจสอบโดยผู้ตรวจสอบบุคคลที่สามที่ได้รับการอนุมัติจากทะเบียน

สถิติ

ข้อมูลสำหรับโครงการนี้

ยอดเงินเกษียณรวม:

24

จำนวนที่เหลือทั้งหมด:

366,327.68